PakTools logoPakToolsPakistan's First Free Online Tools

Roofing Material Calculator in Pakistan

Estimate shingles, underlayment and nails for a roof from its size, pitch and waste allowance.

Your result

Roof area (flat)
1,200 sq ft
Adjusted area (pitch + waste)
1,650 sq ft
Bundles of shingles (1 bundle ≈ 33.3 sq ft)
50 bundles
Rolls of underlayment (1 roll ≈ 400 sq ft)
5 rolls
Roofing nails (approx.)
33.0 kg

🔒 Runs in your browser. Nothing uploaded.

How to use

  1. 1

    Enter the roof length and width in feet.

  2. 2

    Choose the roof pitch and your waste allowance (10% is typical).

  3. 3

    Read the adjusted area, shingle bundles, underlayment rolls and nails.

Formula / How it works

Roof area = length × width (square feet)

Adjusted area = roof area × pitch multiplier × (1 + waste % / 100)

Pitch multipliers: flat 1.0, low 1.1, medium 1.25, steep 1.4.

Bundles of shingles = adjusted area / 33.3, rounded up.

Rolls of underlayment = adjusted area / 400, rounded up.

Nails ≈ adjusted area / 100 × 2 kg.

Frequently asked questions

What is a roofing square?

A roofing square is 100 square feet of roof area. One bundle of shingles covers about a third of a square (33.3 sq ft), so three bundles cover one square.

Why does pitch change the area?

A pitched roof has more surface than its flat footprint. The steeper the pitch, the larger the multiplier — a steep roof can be 40% larger than its footprint.

How much waste should I allow?

10% is typical for a simple roof. Complex roofs with hips, valleys and dormers need 15% or more.

Does this include ridge caps and flashing?

No. This estimates shingles, underlayment and nails only. Ridge caps, flashing, vents and drip edge are ordered separately by length.

Are these figures exact?

No — they are estimates for planning. Always confirm quantities with your supplier, who can allow for the exact shingle product and roof shape.

Was this Roofing Material Calculator helpful?

Last updated: 15 November 2026 | Reviewed by: Marwat