PakTools logoPakToolsPakistan's First Free Online Tools

Concrete Calculator in Pakistan

Work out how much concrete you need for a slab, footing or floor — in cubic feet, yards and metres, plus cement bags.

Your result

Volume
33.33 cubic feet
Volume
1.23 cubic yards
Volume
0.94 cubic metres
Cement bags needed (50 kg)
7 bags
Sand + aggregate
Allow roughly 2 parts sand and 4 parts aggregate per 1 part cement by volume (1:2:4 mix) — buy sand and aggregate to match the volume above.

🔒 Runs in your browser. Nothing uploaded.

How to use

  1. 1

    Enter the length, width and thickness of your slab, and how many slabs you are pouring.

  2. 2

    Check the volume in cubic feet, yards and metres, and the estimated cement bags.

  3. 3

    Order the concrete or materials, adding 5-10% extra for waste.

Formula / How it works

Volume (cubic feet) = length (ft) x width (ft) x thickness (inches) / 12, multiplied by quantity.

Cubic yards = cubic feet / 27. Cubic metres = cubic feet x 0.0283168.

Cement bags (50 kg) = cubic metres x 7, rounded up.

Assumption: 1 cubic metre of concrete needs about 7 bags of 50 kg cement — an estimate; the exact number depends on the mix ratio and cement brand.

Order 5-10% extra to allow for spillage and uneven ground.

Frequently asked questions

How many bags of cement do I need for 1 cubic metre of concrete?

About 7 bags of 50 kg cement per cubic metre, using a standard 1:2:4 mix. This calculator uses that estimate; the exact number depends on your mix design, so confirm it with your supplier.

How thick should a concrete slab be?

A typical residential floor or patio slab is 4 inches (100 mm) thick. Driveways and areas carrying vehicles are usually 5-6 inches. Always follow your engineer or local building guidance for load-bearing slabs.

What is the difference between cubic feet, cubic yards and cubic metres?

They are the same volume in different units. 1 cubic yard = 27 cubic feet, and 1 cubic metre = about 35.31 cubic feet. Suppliers in Pakistan usually quote per cubic foot or per bag, while ready-mix is often sold per cubic metre.

Should I order extra concrete?

Yes — order 5-10% extra. Ground is rarely perfectly level, some concrete is lost in the mixer and wheelbarrow, and running short mid-pour creates a weak joint.

Is this calculator accurate enough to order from?

It is accurate for the measurements you enter, but the cement-bag figure is an estimate based on the 7-bags-per-cubic-metre assumption. Confirm the final quantities with your concrete supplier before ordering.

Was this Concrete Calculator helpful?

Last updated: 15 November 2026 | Reviewed by: Marwat